Strategy for the use of bioLNG in the area of OMGGS, including the possibility of producing biogas and locating the biogas power plant.
The study aims to present not only the biogas production strategy, but also the possibility of locating a biogas plant and using bioLNG in the Gdańsk-Gdynia-Sopot Metropolitan Area.
Document is available -> here.
Concept development with elements of feasibility study for (bio-)LNG (liquefied biogas) installations for Żegluga Gdańska Sp. z o.o.
Document is available -> here.
The subject of the study is to present technology and identify possibility of modifying the existing power supply system with the application of the necessary components to use liquefied natural gas (LNG / bioLNG) as fuel for the selected vessel.
(Bio-)LNG (liquefied biogas) installation for Przedsiębiorstwo Komunikacji Trolejbusowej Spółka z o.o. in Gdynia as a backup source of energy supplying the trolleybus network.
It is necessary to investigate the possibility of supplying the trolleybus traction in Gdynia with a source that uses renewable energy to take care of the environment globally. The aim of the study is to conduct a feasibility study of bioLNG (liquefied biogas) installation for Przedsiębiorstwo Komunikacji Trolejbusowej Spółka z o.o. in Gdynia (PKT) as a backup source of energy supplying the trolleybus network.
Document is available -> here.
Feasibility study of bioLNG (liquefied biogas) installations for Zakład Utylizacyjny Sp. z o.o. in Gdańsk in order to use bioLNG as a source of electrical energy.
The area of the ZU produces electricity and heat from the combustion of biogas recovered from waste heaps, as well as from PCE waste incineration plants and the planned biogas plant in the near future.
The study aims to present a feasibility study of the bioLNG installation – liquefied biogas, for Zakład Utylizacyjny Sp. z o.o. in Gdańsk company to use bioLNG as a source of electrical energy.
Document is available -> here.